榆林市高泥沙含量引黄工程泵站设计

Selection Analysis of Yellow River Diversion Pump Station Based on Heavy Sediment in Yulin
在线阅读 下载PDF
导出
摘要 为了确保黄河高含沙水流下的抽水泵站能满足使用要求,基于榆林市引黄工程基本概况,在分析泵站布置、水沙特性和泵站特征水位、净扬程的基础上,从投资、运行和管理方面对葛富村一级泵站与百雨沟二级泵站泵型和台数进行探讨。结果表明,立式离心泵具有较好的抗沙磨蚀性能,两级泵站采用5台工作泵、1台备用泵的方式,可在确保引水流量的基础上减轻泥沙腐蚀。 In order to ensure that the pumping station under the high sediment concentration water flow of the Yellow River meets the requirements for use,based on the basic overview of the Yellow River Diversion Project in Yulin,this paper analyzed the pump station layout,water and sediment characteristics,pump station characteristic water level,and net head.From the aspects of investment,operation,and management,the pump types and quantities of the Gefu Village first stage pump station and the Baiyugou second stage pump station were discussed.The results showed that the vertical centrifugal pump had good anti-sand erosion performance.The two-stage pump station adopted a method of five working pumps and one standby pump,which could reduce sediment corrosion while ensuring the water diversion flow rate.
作者 马源 MA Yuan(Yulin Hehu Reservoir and Immigration Work Center,Yulin 719000,China)
出处 《供水技术》 2025年第4期26-30,共5页 Water Technology
关键词 泥沙 引黄工程 抽水 泵站 sediment Yellow River Diversion Project pump water pumping station
  • 相关文献

参考文献4

二级参考文献41

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部