期刊文献+

PCRC-装配式钢混组合快速建造体系关键施工技术

Key Construction Technologies for PCRC Prefabricated Steel Concrete Composite Rapid Construction System
在线阅读 下载PDF
导出
摘要 本研究聚焦于工业上楼快速建造体系下的关键施工技术,阐述预应力混凝土梁在工业化建造中的高效制备与精准安装技术,探讨钢管混凝土柱的制作精度控制、混凝土灌注工艺及其对整体结构性能的保障作用,并分析二者连接节点的关键施工要点,研究成果为该体系的快速建造提供技术支持,旨在为提升工业上楼项目施工效率与质量提供理论依据与实践参考。 This study focuses on the key construction technologies under the rapid construction system of industrial buildings moving upwards.It expounds the efficient preparation and precise installation technologies of prestressed concrete beams in industrialized construction,discusses the manufacturing precision control and concrete pouring process of steel pipe concrete columns and their guarantee role for the overall structural performance,and analyzes the key construction points of the connection nodes between the two.The research results provide technical support for the rapid construction of this system,aiming to provide theoretical evidence and practical references for improving the construction efficiency and quality of industrial building moving upwards projects.
作者 常泽英 CHANG Zeying(Shenzhen SEZ Construction Science and Industry Design Consultants Co.,Ltd.)
出处 《广东建材》 2025年第8期129-132,共4页 Guangdong Building Materials
基金 广东省住房和城乡建设厅科技创新计划——“装配式快速建造结构体系研究”,(编号:20250226K0032).
关键词 先张法 预应力混凝土 安装节点 施工技术 钢混组合结构 Pretensioned method Prestressed concrete Install nodes Construction technology Steel-concrete composite structure
  • 相关文献

参考文献12

二级参考文献86

共引文献643

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部