摘要
目前,超/特高压输电线路在运行期间经常会出现引流板发热问题,处理引流板发热的关键就是搭接临时引流线,然而使用现有工具作业时存在诸多弊端,例如携带不便、操作过程复杂、金具易掉落等。为解决这些问题,设计了一种新型快速旁路引流装置(包含夹具和引流线两部分),该装置携带方便、使用便捷,可以快速完成引流线搭接操作,助力电力系统的正常运行。
At present,the problem of drain plate heating often occurs during the operation of ultra/UHV transmission lines,and the key link is to lap the temporary drainage line when dealing with the drainage plate heating,but there are many drawbacks when using existing tools to operate,such as inconvenient to carry,complex operation process,and easy to fall off fittings.Therefore,in view of those inconveniences,this paper designs a new type of fast bypass drainage device,which includes two parts,clamp and drainage line,which is easy to carry and simple to operate,and can quickly complete the lap operation of drainage line to ensure the normal operation of power system.
作者
吴维国
林世忠
邹鑫
朱理宏
马鹏飞
沈伟
徐文豪
WU Weiguo;LIN Shizhong;ZOU Xin;ZHU Lihong;MA Pengfei;SHEN Wei;XU Wenhao(Anhui Power Transmission and Transformation Engineering Co.,Ltd.,Hefei 230022,China;Anhui University,Hefei 230601,China)
出处
《电工技术》
2025年第11期217-219,共3页
Electric Engineering
基金
国网安徽送变电工程有限公司科研项目“引流板发热超高温度带电处理隔热技术研究与应用”(编号YJ-2408-FW-0008)。