硅片清洗机与腐蚀刻蚀机在晶圆制造流程中的重要性研究

Importance of Silicon wafer cleaning machine and corrosion etching machine in wafer manufacturing process
在线阅读 下载PDF
导出
摘要 随着半导体技术向更先进制程节点发展,晶圆制造对工艺精度和良率的要求显著提升。作为关键设备,硅片清洗机和腐蚀刻蚀机分别承担去除表面污染物及精准图案转移的核心功能。通过分析清洗与刻蚀工艺在晶圆制造流程中的技术原理、工艺要求及设备演进,结合实际案例探讨两者对芯片良率、制程效率及产业发展的影响,文章揭示了其不可替代性。 With the development of semiconductor technology towards more advanced process nodes,the requirements for process accuracy and yield in wafer manufacturing have significantly increased.Silicon wafer cleaning machine and etching machine are key equipment that respectively undertake the core functions of removing surface pollutants and precise pattern transfer.This article analyzes the technical principles,process requirements,and equipment evolution of cleaning and etching processes in wafer manufacturing processes,and explores their impact on chip yield,process efficiency,and industry development through practical cases,revealing their irreplaceability.
作者 马玉水 张立军 MA Yushui;ZHANG Lijun(Shandong Liansheng Electronic Equipment Co.,Ltd.,Liaocheng,Shandong 252000,China;Liaocheng Hairong E-commerce Co.,Ltd.,Liaocheng,Shandong 252000,China)
出处 《计算机应用文摘》 2025年第14期201-203,共3页
关键词 晶圆制造 硅片清洗机 腐蚀刻蚀机 良率控制 先进制程 wafer manufacturing Silicon wafer cleaning machine corrosion etching machine yield control advanced manufacturing process
  • 相关文献

参考文献2

二级参考文献12

  • 1Spearman M L, Woodruff D L, Hopp W J. CONWIP: a pull alternative to Kanban [ J ]. Int. J. Prod, 1990 (28) : 879-894.
  • 2Chung Shu-Hsing, Yang Ming-Hsien, Cheng Cho-ming. The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories [ J ]. IEEE Transactions on computers, packing, and manufacturing technology, 1997,20 (4) :278-287.
  • 3Pearn W L, Chung S H, Lai C M. Due-date assignment for wafer fabrication under demand variate Environment [ J ]. IEEE Transactions on semiconductor manufacture, 2007,20 (2) :165-175.
  • 4Weeks J K. A simulation study of predictable due-dates [ J ]. Manage Sci, 1979,25 (4) :363-373.
  • 5Smith M L, Seidman A. Due date selection procedure for job-shop simulation[ J]. Comput Ind. Eng, 1993,7 (3) : 199-207.
  • 6Enns S T. Job shop flow time prediction and tardiness control using queueing analysis [ J ]. Int. J. Prod, 1993,31 ( 9 ) : 2045- 2057.
  • 7Kaplan A C,Urnal A T. A probabilistic cost-based due date assignment model for job shops [ J]. Int. J. Prod, 1993,31 (12) :2817-2834.
  • 8Sha D Y, Hsu S Y. Due-date assignment in wafer fabrication using artificial neural networks[ J ]. Int J Adv Manuf Technol,2004 (23) :768-775.
  • 9Chiu Chao-chang, Chang Pei-chann, Chiu Nan-hsing. A case- based expert system for due-date assignment in a wafer fabrication factory[ J]. Journal of Inteligent Manufacturing,2003, 14 ( 3-4 ) :287-296.
  • 10严浩云,李宏余.基于面向负荷的生产控制的交货期设置方法[J].计算机集成制造系统,2008,14(6):1200-1205. 被引量:9

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部