期刊文献+

深远海风力发电用高压电缆制造车间数字化建设 被引量:2

Digital Construction of HV Cable Manufacturing Workshop for Deep-Sea Wind Power Generation
原文传递
导出
摘要 海上风电的开发利用是践行双碳目标的重要举措。深远海风力发电用高压电缆制造车间数字化建设已成为推进海上风电用海底电缆、海洋脐带缆、特种电缆研发和制造的有力支撑。通过对海底电缆、海洋脐带缆产线的设备配置和工艺流程的仔细研究,在深远海风力发电用高压电缆制造车间部分工序智能化提升的基础上,利用工业互联网技术进行数字化建设,构建了生产制造数字化管控平台,完成了数字化建设项目,为未来向智能工厂迈进打下了坚实基础。 The development and utilization of offshore wind power is an important measure to achieve the dual carbon goals.The digital construction of the high-voltage(HV)cable manufacturing workshop for deep-sea wind power generation has become a powerful support for promoting the research and manufacturing of submarine cables,marine umbilical cables,and special cables for offshore wind power.Through careful study of equipment configuration and process flow of submarine cable and marine umbilical cable production line,on the basis of intelligent improvement of some processes in the HV cable manufacturing workshop for deep-sea wind power generation,digital construction is carried out using industrial Internet technology,a digital control platform for production manufacturing is built,and digital construction projects are completed,laying a solid foundation for the future to move towards intelligent factories.
作者 李尚伟 唐敏 孙贵林 钱志康 梁克云 李伟然 钮晓平 熊爱华 LI Shangwei;TANG Min;SUN Guilin;QIAN Zhikang;LIIANG Keyun;LI Weiran;NIU Xiaoping;XIONG Aihual(Jiangsu Hengtong Intelligence Equipment Co.,Ltd.,Suzhou 215200,Jiangsu,China;Jiangsu Hengtong Submarine Power Cable Co.,Ltd.,Suzhou 215537,Jiangsu,China)
出处 《光纤与电缆及其应用技术》 2025年第3期25-29,33,共6页 Optical Fiber & Electric Cable and Their Applications
关键词 风力发电 海底电缆 海洋脐带缆 数字化生产 智能化工厂 wind power generation submarine cable marine umbilical cable digital production intelligent factory
  • 相关文献

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部