铁路站场改造工程一般规模大、涉及专业多、技术复杂、时间紧迫、安全要求高。研究了一种ZPW-2000无绝缘轨道电路设备调试方案,极大地降低了现场施工工作量。
The reconstruction projects for railway stations and yards are generally large in scale,involve many specialties,are technologically complicated,face urgent time pressure,and have high safety requirements.A commissioning scheme for ZPW-2000 jointless track circuit indoor equipment is studied,which greatly reduces the onsite construction workload.
出处
《铁路通信信号工程技术》
2024年第S1期74-76,共3页
Railway Signalling & Communication Engineering