摘要
通过对高压旋喷桩的试验研究,解决处理由动力机器基础振动引起排架柱基础不均匀沉降的事故,为加固设计提供依据。
With the experimental researches of the chemical churning pile, we have solved the problem of unequal settlement of the frame foundatio cattsed by foundation's vibrating of dynamical machine, and obtained useful information for the reinforcing design.
出处
《低温建筑技术》
北大核心
1992年第4期26-28,共3页
Low Temperature Architecture Technology
关键词
锻锤
基础
柱
排架
旋转喷射桩
Forging hammer foundation
chemical churning pile
reinforcement