昆山某小区地下室采用“迎水面止水帷幕、前置堵水层、中埋式止水带、后置密封层、背水面防水涂料”5层复合防水结构的综合治理方案,并通过现场精细化施工管控,有效解决了沉降缝渗漏问题,该施工方案可为同类型地下室沉降缝渗漏治理提供参考。
A residential basement in Kunshan adopts a comprehensive treatment of 5-layer composite waterproofing structure:water-stop curtain on the water-facing side,pre-embedded water-stop layer,middle-embedded water-stop strip,post-embedded sealing layer,and waterproofing coating on the back side.Through refined on-site construction management,the problem of water leakage in settlement joints is effectively solved.This construction plan can provide a reference for the leakage treatment of water settlement joints in similar basement.
作者
樊绿叶
魏振巍
申纪创
师文豪
朱晓丹
刘嘉
刘华明
Fan Lvye;Wei Zhenwei;Shen Jichuang;Shi Wenhao;Zhu Xiaodan;Liu Jia;Liu Huaming(Kunshan Underground Space Technology Research Institute Co.,Ltd.,Kunshan,Jiangsu 215314,China;Kunshan Construction Engineering Quality Testing Center,Kunshan,Jiangsu 215337,China;Suzhou University of Science and Technology School of Civil Engineering,Suzhou,Jiangsu 215699,China;Kunshan Construction Engineering Design and Drawing Review Center,Kunshan,Jiangsu 215316,China)
出处
《中国建筑防水》
2025年第4期31-35,共5页
China Building Waterproofing
基金
国家自然科学基金项目(42202306)
苏州市科技计划(基础研究)项目(SJC2023002)。
关键词
地下室防水
沉降缝
渗漏治理
注浆
多层复合防水结构
basement waterproofing
settlement joint
leakage treatment
grouting
multi-layer composite waterproofing structure