期刊文献+

LNG接收站高压压缩机工艺设计浅析

Analysis of High Pressure Compressor Process Design for LNG Receiving Station
在线阅读 下载PDF
导出
摘要 在接收站投产初期,由于接收站市场用户的培育需要一个渐进的过程,并且考虑到在开/试车过程中会产生大量蒸发气体(以下称BOG气体),而外输LNG量又达不到足够冷凝BOG,因此往往会将其直接排放至火炬,白白烧掉。这种情况在我国建设的前几座接收站都发生过,经过十余年的技术革新,目前接收站常用处理BOG的方法有3条工艺路线,分别如下:BOG经过低压压缩机压缩后去再冷凝器冷凝后外输;BOG经过低压压缩机压缩,再经过BOG高压压缩机外输;不压缩,直接通过火炬放空。其中通过火炬放空是最不得已的方法,仅在试车和发生重大事故时采用。通过结合近年来BOG高压压缩机的运行经验,对BOG高压压缩机的工艺设计作浅要分析,希望能为后续LNG接收站的设计及操作提供借鉴和帮助。 In the early stages of the commissioning of the receiving station,due to the gradual process required for cultivating the market users of the receiving station,and considering that a large amount of evaporated gas(hereinafter referred to as BOG gas)will be generated during the start-up/commissioning process,and the amount of LNG exported is not enough to condense BOG,it is often directly discharged into the flare and burned for nothing.This situation has occurred in the first few receiving stations built in China.After more than ten years of technological innovation,there are currently three commonly used methods for processing BOG in receiving stations,as follows:BOG is compressed by a low-pressure compressor,then condensed by a condenser and exported.BOG is compressed by a low-pressure compressor and then exported by a high-pressure BOG compressor.Not compressed,directly vented through the torch.Among them,venting through the torch is the last resort,which is only used during testing and in the event of major accidents.By combining the operating experience of BOG high-pressure compressors in recent years,this paper provides a brief analysis of the process design of BOG high-pressure compressors,hoping to provide reference and assistance for the design and operation of LNG receiving stations in the future.
作者 牛斌 NIU Bin(Shandong Branch,CNOOC Gas and Power Group,Jinan 250011,China)
出处 《山东化工》 2025年第3期211-213,共3页 Shandong Chemical Industry
关键词 液化天然气 压缩机 BOG 再冷凝 liquified natural gas compressor BOG recondenser
  • 相关文献

参考文献7

二级参考文献56

  • 1李兆慈,王敏,亢永博.LNG接收站BOG的再冷凝工艺[J].化工进展,2011,30(S1):521-524. 被引量:30
  • 2曹文胜,鲁雪生,顾安忠,林文胜,石玉美.液化天然气接收终端及其相关技术[J].天然气工业,2006,26(1):112-115. 被引量:35
  • 3刘浩,金国强.LNG接收站BOG气体处理工艺[J].化工设计,2006,16(1):13-16. 被引量:130
  • 4初燕群,陈文煜,牛军锋,刘新凌.液化天然气接收站应用技术(Ⅰ)[J].天然气工业,2007,27(1):120-123. 被引量:67
  • 5陈雪,马国光,付志林,李明,谢剑飞.我国LNG接收终端的现状及发展新动向[J].煤气与热力,2007,27(8):63-66. 被引量:27
  • 6Querol E, Gonzalez-Regueral B. Boil off gas (BOG) management in Spanish liquid natural gas (LNG) terminals [J]. Applied Energy, 2010, 87(11) : 3384-3392.
  • 7Li Y, Bai F. A policy study examining the use of imported LNG for gas-fired power generation on the southeast coast of China. Energy Policy [J]. 2010, 38(2) : 896-901.
  • 8Shin M W, et al. Optimal operation of the Boil-Off Gas compression process using a boil-off rate madel for LNG storage tanks[J]. Korean Journal of Chemical Engineering, 2008. 25(1) : 7-12.
  • 9Papadakis G A. On LNG Boil-off Proceedings of the 8th International Symposium for Loss Prevention and Safety Promotion in the Process In- dustries [J]. Vol. I, Antwerp, Belgium, June6-9, 1995: 601-615.
  • 10Mabuchi Nobuhiro(Osaka Gas Co. , L. , JPN). BOG Reliquefaction with Cold Energy Storage and Utilization of LNG Cold Energy UsingCascade Process[J]. Energy and Resources, 2006, 27 (5) : 334-336.

共引文献145

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部