大型空分装置预防粗氩塔氮塞的优化操作

Optimized Operation of Large Air Separation Unit to Prevent Nitrogen Plugging in Crude Argon Column
在线阅读 下载PDF
导出
摘要 介绍了40000m3/h空分装置整体工艺流程,阐述了空分装置氩系统发生氮塞对上、下游工序的影响,分析了氩系统发生氮塞的根本原因,制定了相应的预防措施,并优化了操作过程,保证了空分装置的产量及纯度。 This article introduces the overall process flow of 40000 m3/h air separation plant,describes the impact of nitrogen plugging on the upstream and downstream processes in the argon system of the air separation unit,analyzes the root causes of nitrogen plugging in the argon system,develops corresponding preventive measures,and optimizes the opera⁃tion process to ensure the output and purity of the air separation unit.
作者 高俊刚 贾永忠 杨尚宇 GAO Jungang;JIA Yongzhong;YANG Shangyu(Inner Mongolia Baotou Steel Union Co.,Ltd.,Baotou,Inner Mongolia Autonomous Region 014010,China)
出处 《冶金动力》 2025年第1期82-85,共4页 Metallurgical Power
关键词 空分装置 氮塞 操作过程优化 air separation unit nitrogen plugs operational process optimization
  • 相关文献

参考文献5

二级参考文献6

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部