摘要
介绍了青藏高原多年冻土特征 ,并结合当前正在开工建设的青藏铁路的设计、施工的具体要求 。
Based on investigation and analysis on permafrost environment during construction of Qinghai\|Tibet Railway and combined with the specific design and construction requirements of being constructed Qinghai\|Tibet Railway at the present. The paper analyzes the effect of Qinghai\|Tibet Railway construction on permafrost environment.
出处
《铁道建筑技术》
2002年第5期54-56,共3页
Railway Construction Technology