产品开发过程并行度优化 被引量:15

Concurrency Optimization in Product Development Process
在线阅读 下载PDF
导出
摘要 并行工程环境中 ,上游产品设计活动和下游过程设计活动之间的重叠 ,可缩短产品开发过程的持续时间。但过多的重叠也会导致不必要的设计修改。为此 ,研究了产品与过程设计活动之间的并行度优化问题 ,并建立了数学模型 ,给出了求解该问题的算法 ,其目的是使因延迟产品开发完成时间和不必要的设计修改而带来的成本尽可能最低。 In concurrent engineering, the overlap between the upstream product design activity and the downstream process design activity can shorten the duration of the product development process. But too much overlap may cause some unnecessary design revision workloads. Therefore, the problem of concurrency optimization between the product and process design activitiesis studied, and the mathematical model is founded. The algorithm for solving this problem is proposed,whose aim is to minimize the total costs caused by the delay of the completion time of the product developmentand the unnecessary design revision workloads.
作者 汪峥 严洪森
出处 《计算机集成制造系统-CIMS》 EI CSCD 北大核心 2002年第11期851-857,共7页
基金 国家自然科学基金资助项目 ( 6 9884 0 0 1)~~
关键词 产品开发过程 并行度 优化 并行工程 CIMS concurrent engineering design activity overlap concurrency optimization
  • 相关文献

参考文献12

  • 1[1]HAUPTMAN O, HIRJI K K. The influence of process concurrency on project outcomes in product development: an empirical study of cross-functional teams[J]. IEEE Transactions on Engineering Management, 1996, 43(2): 153-164.
  • 2[2]AITSAHLIA F, JOHNSON E, WILL P. Is concurrent engineering always a sensible proposition?[J].IEEE Transactions on Engineering Management, 1995, 42(2): 166-170.
  • 3[3]YASSINE A A, CHELST K R, FALKENBURG D R. A decision analytic framework for evaluating concurrent engineering[J]. IEEE Transactions on Engineering Management, 1999,46(2):144-157.
  • 4[4]KRISHNAN V, EPPINGER S D, WHITNEY D E. A model-based framework to overlap product development activities[J].Management Science, 1997, 43: 437-451.
  • 5[5]LOCH C H,et al. Communication and uncertainty in concurrent engineering[J].Management Science, 1998,44: 1032-1048.
  • 6[6]TERWIESCH C,et al. Measuring the effectiveness of overlapping development activities[J].Management Science,1999, 45(4): 455-465.
  • 7[7]HA A Y, et al.Optimal timing of reviews in concurrent design for manufacturability[J].Management Science, 1995, 41: 1431-1447.
  • 8[8]AHMADI R, WANG R H. Managing development risk in product development processes[J].Operations Research, 1999, 47: 235-246.
  • 9[9]SMITH R P,et al. Identifying controlling features of engineering design iteration[J].Management Science, 1997, 43: 276-293.
  • 10[10]SMITH R P, et al. A predictive model of sequential iteration in engineering design[J].Management Science,1997,43:1104-1120.

同被引文献113

引证文献15

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部