3[2]Cooper K.W., R.A.Erth,Centrifugal water chilling systems;focus on off-design performance,Heating/Piping/Air Conditioning Jan/P63-67 1978.
4[3]House,J.M.,T.F.Smith,A system approach to optimal control for HVAC and building systems, ASHRAE Transactions 1995.
5[4]Shengwei Wang,Xinqiao Jin,Model-based optimal control of VAV air-conditioning system using genetic algorithm,Building and Environment 35(2000)471-487.
6[5]B.C.Ahn,et al,Optimal control development for chilled water plants using a quadratic representation,Energy and Buildings 33(2001)371-378.
7[6]H.Zimmer,Chiller control using on-line allocation for energy conservation,ISA Annual Conference Proceedings,No,522,1976.
8[7]C.Chun and N.Norden,Computer optimization of refrigeration systems in a textile plant:a case history.Automation,18(6),1982.
9[8]L.EEnterline,A.Sommer and A.Kaya,Chiller optimization by distributed control to save energy,ISA Transactions,23(2),1984.
10[9]A.Lau,W.Beckman et al,Development of computerized control strategies for a large chilled water plant,ASHRAE Transactions,91(2),1985.