穿黄工程河道缩窄试验研究

Feaibility study on river narrowing schemes for Yellow-River-crossingworks of Water Transfer Project from South to North
在线阅读 下载PDF
导出
摘要 在穿黄工程线路比选试验成果基础上,通过实体模型试验,进一步研究了中线隧洞方案和下2线渡槽方案在河道不同缩窄宽度条件下,对河势、水位、流速及河床冲淤的影响,认为中线隧洞方案河道缩窄至3.0km和下2线渡槽方案河道缩窄至3.8km均可行。 By physical model tests,the influences of the middle?line tunnel scheme and the lower line aqueduct scheme on river regime, water level, velocities and river?bed scour under different river narrowing widths were further studied on the basis of comparison and initial selection test of Yellow?River ?crossing works. The test results showed the middle?line tunnel scheme with river width 3.0 km and the lower?line Ⅱ aqueduct scheme with width 3.8 km are feasible.
出处 《长江科学院院报》 CSCD 北大核心 2002年第B09期51-53,共3页 Journal of Changjiang River Scientific Research Institute
关键词 穿黄工程 河道缩窄 河势 Yellow-River-crossing works river narrowing river regime
  • 相关文献

参考文献4

  • 1长江水利委员会.南水北调中线工程初步可行性研究专题之七--穿黄工程[M].武汉:长江水利委员会,1991..
  • 2长江科学院.南水北调中线工程穿黄线路比选动床模型试验阶段报告[M].武汉:长江科学院,1997..
  • 3长江科学院.南水北调中线工程穿黄河段动床模型设计及验证试验报告[M].武汉:长江水利委员会,1996..
  • 4长江科学院.南水北调中线穿黄工程河道动床模型试验研究阶段报告[M].武汉:长江水利委员会,1999..

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部