期刊文献+

丹江口大坝加高工程水力学试验研究

Hydraulics study on heightened scheme of Danjiangkou Project
在线阅读 下载PDF
导出
摘要 介绍了丹江口大坝加高后的水力学模型研究成果,含枢纽泄流能力、溢流坝面及门槽边壁压力特性以及坝下河床冲刷等,并与大坝加高前已运行30余年的原型观测资料进行了对比,分析了其合理性和可靠性,对存在的问题亦提出了改进措施。 This paper introduces the hydraulics test results on the heightened scheme of Danjiangkou Dam, including discharge capacity,pressure characteristics of the spillway surface and in gate slots region, scouring situation of the riverbed downstream dam, etc.. By comparing the test results with prototype observation data from the existing dam, which has run for over thirty years, their rationality and reliability are analyzed, and the improvement measures for solving existing problems were proposed.
出处 《长江科学院院报》 CSCD 北大核心 2002年第B09期14-17,共4页 Journal of Changjiang River Scientific Research Institute
关键词 水力学 试验 大坝 加高 泄流能力 时均压力 基岩冲刷 丹江口水利枢纽 heightening of dam discharge capacity time average pressare reproductive model test foundation rock scour
  • 相关文献

参考文献2

  • 1毛新仪 陈建.丹江口水利枢纽(后期)水工整体模型试验报告[M].武汉:长江科学院,1993..
  • 2陈忠儒 唐碧秀.丹江口大坝加高堰顶溢流水工断面模式试验报告[M].武汉:长江科学院,1993..

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部