摘要
钻爆法是铁路隧道岩体开挖的主要施工方式。为进一步掌握铁路隧道施工废水处理技术水平,对国内铁路建设项目钻爆法施工废水水质、水量预测模型、前端处理、末端处理等关键内容和技术进行梳理,并从水量预测模型、废水前端处理和末端处理3个方面提出进一步优化废水处理的建议。
Drilling and blasting method is the main construction method for rock excavation in railway tunnels.To further master the level of wastewater treatment technology in railway tunnel construction,key contents and technologies such as water quality and quantity prediction models,front-end treatment,and end treatment of drilling and blasting construction wastewater in domestic railway construction projects are sorted out.Suggestions for further optimizing wastewater treatment are proposed from three aspects:water quantity prediction models,front-end treatment,and end treatment of wastewater.
作者
樊骅
苗国林
许卫武
FAN Hua;MIAO Guolin;XU Weiwu(Energy Saving&Environmental Protection&Occupation Safety and Health Research Institute,China Academy of Railway Sciences Co.,Ltd.,Beijing 100081,China;Quality Department,Xizang Railway Construction Co.,Ltd.,Lhasa Xizang 850000,China;Lhorong Project Department,Xizang Railway Construction Co.,Ltd.,Lhorong Xizang 855400,China)
出处
《铁路节能环保与安全卫生》
2024年第6期23-29,共7页
Railway Energy Saving & Environmental Protection & Occupational Safety and Health
关键词
铁道工程
钻爆法施工
隧道排水
污水处理
Railway engineering
Drilling and blasting method construction
Tunnel drainage
Sewage disposal