摘要
文通过实际工程项目,总结出石材幕墙双切面背栓式干挂施工方法,相比传统的施工工艺,本施工方法有效解决了传统的钢销式、通槽式、短槽式等施工工艺存在的石材易破损、受力不合理、安全性差等问题,具有较强的先进性和引领性。不仅能满足建筑师在造型上的特殊要求,而且更优异的受力和抗震性能推动了石材幕墙更加广阔的应用前景,是国内幕墙施工技术发展的方向。
Through the actual project,the paper summarizes the stone curtain wall double-section back bolt dry hanging construction method.Compared with the traditional construction technology,this construction method effectively solves the stone easy to damage,unreasonable force,poor safety and other problems existing in the traditional steel pin,through slot and short slot construction technology,and has strong advanced and leading characteristics.It can not only meet the special requirements of architects in modeling,but also the better force and seismic performance promote the broader application prospects of stone curtain wall,which is the direction of the development of domestic curtain wall construction technology.
作者
赵小兵
Zhao Xiaobing(Gansu Third Construction Group Limited Company,Lanzhou 730000,China)
出处
《石材》
2025年第1期40-42,共3页
Stone
关键词
石材幕墙
双切面
背栓式干挂
施工技术
stone curtain wall
double section
back bolt type dry hanging
construction technique