摘要
针对某原支护结构设计为“灌注桩+搅拌桩止水+预应力锚索支护+喷混凝土”的深基坑支护超期后,提出两种基坑加固方案,并分别介绍两种方案的工艺流程、操作要点、优缺点、使用范围等内容。
In view of the expiration of a deep foundation pit supporting structure designed as“grouting pile+mixing pile+prestressed anchor cable support+shotcrete”,two reinforcement schemes for foundation pit are proposed,and the technological process,operation key points,advantages and disadvantages,and application scope of the two schemes are introduced respectively.
作者
何宇
HE Yu(China Construction Second Engineering Bureau Ltd.,Beijing 101101,China)
出处
《工程建设与设计》
2024年第24期24-26,共3页
Construction & Design for Engineering
关键词
深基坑
超期
加固
技术要点
deep foundation pit
exceed the time limit
reinforce
technical essentials