一起10 kV出线故障引起的通信通道退出案例分析 被引量:1

A Case Study of Communication Channel Exit Caused by 10 kV Line Fault
在线阅读 下载PDF
导出
摘要 站用电系统是变电站操作、监控、通信的保证,也是电网设备正常运行和信号正确上送的基础。由于部分变电站站用电系统设备老化、未可靠接入UPS电源等原因,当一次系统发生故障跳闸时有可能使调度数据网两个通道退出,造成变电站信号上传中断,影响监控值班员对跳闸事故的分析和处置。本文首先对一起10 kV线路故障跳闸造成的通信通道退出案例进行深入分析,然后对徐州地区的变电站线路跳闸引起的双通道退出事件进行关联性统计,最后提出改进和应对措施。 Station power supply system is the guarantee of substation operation,monitoring and communication,and also the basis of normal operation of power grid equipment and correct signal transmission.Due to the aging of equipment in some substation power system and unreliable access to UPS power supply,two channels of dispatching data network may exit when a system failure trip occurs,resulting in the interruption of substation signal upload,which affects the monitoring duty personnel's analysis and handle trip accidents.This paper firstly analyzes the communication channel exit case caused by a 10 kV line fault trip,and then conducts correlation statistics on the double-channel exit events caused by the substation line trip in Xuzhou area,and finally puts forward improvements and countermeasures.
作者 顾春阳 张乐 GU Chunyang;ZHANG Le(State Grid Jiangsu Electric Power Co.,Ltd.Xuzhou Power Supply Branch,Jiangsu Xuzhou 221000,China)
出处 《农村电气化》 2024年第11期57-61,共5页 Rural Electrification
关键词 站用电系统 UPS 故障跳闸 通道退出 改进措施 station power system UPS fault trip channel exit improvement measure
  • 相关文献

参考文献8

二级参考文献43

共引文献22

同被引文献14

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部