定向钻孔及本煤层钻孔融合治理采煤工作面瓦斯

Combination of Directional Drilling and Coal Seam Drilling to Control Gas in Coal Mining Face
在线阅读 下载PDF
导出
摘要 为满足煤炭高强度开采瓦斯治理需要,结合15303综放工作面现场情况,提出千米定向钻孔与本煤层钻孔融合方式治理瓦斯。综合理论分析及数值模拟确定千米定向钻孔布置层位为21~45 m,在回采巷道掘进期间同步进行千米定向钻孔钻进,确保回采前钻孔钻进完成;在回采巷道按2 m间距布置本煤层钻孔,实现回采区域瓦斯预抽。现场应用后,15303综放工作面千米定向钻孔瓦斯抽采效率较高,采面回风顺槽、回风隅角瓦斯体积分数分别控制在0.27%、0.69%以内,保障了采面安全生产。 In order to meet the need of gas control in high-intensity coal mining,combined with the site situation of 15303 fully-mechanized caving face,a combination method of kilometer directional drilling and coal seam drilling was proposed to control gas.Based on theoretical analysis and numerical simulation,kilometer directional drilling layout was determined to be 21-45 m,and km directional drilling was carried out synchronously during mining roadway excavation to ensure the completion of pre-mining drilling;the coal seam boreholes were arranged at 2 m spacing in the mining roadway to realize gas pre-drainage in the mining area.After the field application,the gas drainage efficiency of 15303 directional borehole in kilometers of fully-mechanized caving face was higher,and the gas volume fraction in the return air roadway and the return air corner of the mining face was controlled within 0.27%and 0.69%respectively,which ensures the safe production of the mining face.
作者 鲁俊伟 LU Junwei(Shanxi Wangjialing Coal Industry Co.,Ltd.,Xinzhou 034000,Shanxi,China)
出处 《能源与节能》 2024年第9期265-267,共3页 Energy and Energy Conservation
关键词 煤炭开采 千米钻孔 瓦斯预抽 coal mining kilometer drilling gas pre-drainage
  • 相关文献

二级参考文献61

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部