期刊文献+

高瓦斯矿放顶煤工作面沿空留巷底板回风岩巷的层位选择

Strata selection of floor return air rock roadway gob-side entry retaining in high gas mine caving face
在线阅读 下载PDF
导出
摘要 常村煤矿开采3号煤,煤层瓦斯含量高,涌出量大,上隅角瓦斯超限严重,通过采用沿空留巷Y型通风方式解决瓦斯问题。为确保上隅角瓦斯不超限,通过煤层底板岩巷穿层钻孔预抽瓦斯,保证工作面安全生产,实现抽掘采平衡。将2305、2306工作面联合布置,共用一条底板岩巷作为沿空留巷回风巷及抽采巷,通过理论计算、地质条件及实验分析,计算出合理的岩巷位置,确保首次、二次回采时巷道不变形。结果表明,相比煤巷(回风巷),可降低修巷费用,且系统布置简单,具有良好应用前景。 No.3 coal is mined in Changcun coal mine,the gas content in the coal seam is high,the quantity of gas emission is large,and the upper corner gas exceeds the limit seriously.In order to ensure that the gas in the upper corner does not exceed the limit,the gas is pre-extracted by drilling hole in the rock roadway of coal floor,and the safe production of working face,and realize the balance of extraction and mining.2305 and 2306 working faces are jointly arranged,sharing a floor rock roadway as goaf-along returning roadway’s return air lane and extraction lane.Through the theoretical calculation and experimental analysis of geological conditions,we determine a reasonable location of rock roadway,ensure the roadway cannot be deformed during the first and secondary mining.Compared with the coal roadway(return air roadway),the cost of roadway maintaining is reduced,and system layout is simple with a good prospect for application.
作者 雷平博 张武涛 原春斌 李树龙 LEI Pingbo;ZHANG Wutao;YUAN Chunbin;LI Shulong(Shaanxi Kaituo Construction Technology Co.,Ltd.,Xi’an 710054,China;Xi’an Green Mining Research Institute Co.,Ltd.,Xi’an 710054,China;Shanxi Huoerxinhe Coal Industry Co.,Ltd.,Changzhi 046600,China)
出处 《陕西煤炭》 2024年第9期86-90,共5页 Shaanxi Coal
关键词 综放面 高瓦斯 沿空留巷 Y型通风 底板岩巷位置 底抽巷预抽 fully mechanized caving face high gas content gob-side entry retaining Y-shaped ventilation location of floor rock roadway pre-extraction of bottom extraction roadway
  • 相关文献

参考文献9

二级参考文献44

共引文献160

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部