期刊文献+

港湾机位运行仿真研究

在线阅读 下载PDF
导出
摘要 机场机位资源是民航业中至关重要的,相比于传统机位来说,港湾机坪可以拥有更多的机位,但港湾机位的缺点也较为明显,机位平均面积较小,进出过程不便,因此,港湾机位的运行策略相较于传统机位更加复杂。本文将得出的推出策略转化为约束条件整合带入基于绩效的机位分配模型中,通过计算各机位的时间效率指数与面积效率指数从而进行优化求解,提高港湾机位的运行安全与机场效益。 Aircraft bay resources are crucial in the civil aviation.Compared with the traditional bay,the harbour bay apron have more space,which with the disadvantages of the average area is small,leading to the inconvenient entry and exit process.So the operation strategy of the harbour bay is more complex than the traditional one.In this paper,the pushing out strategy which is transformed into constraint condition integration into the performance-based position allocation model,then it is optimized by calculating the time efficiency index and area efficiency index of each position,so as to improve the operation safety and airport benefit of the bay station.
作者 杜容兴
出处 《科技风》 2024年第23期139-141,共3页
关键词 港湾机位 偏离误差 机位分配 Harbour Bay Deviation Error Position Allocation
  • 相关文献

参考文献7

二级参考文献54

  • 1乐美龙,檀财茂.非正常运行下机场停机位实时分配模型[J].工业工程,2014,17(1):12-16. 被引量:3
  • 2文军,孙宏,徐杰,梁志杰.基于排序算法的机场停机位分配问题研究[J].系统工程,2004,22(7):102-106. 被引量:39
  • 3AIRBUS.Airbus global market forecast (2011-2030)[OL],(2011-9-19)[2011-9-19],http://www.airbus.com/en/corporate/gmf/.
  • 4YAN S,HUO C.Optimization of multiple objective gate assignments[J].Transportation Research,2001,35 A:413-432..
  • 5Ding H,Lim A,Rodrigues B,et al.New heuristics for the overconstrained airport gate assignment problem[J].Journal of the Operational Research Society,2004,55:760-768.
  • 6H Ding,A Lim,B Rodrigues,et al.Aircraft and gate scheduling optimization at airports[C].Proceedings of the 37th Annual Hawaii International Conference on System Sciences, IEEE,2004:74-81..
  • 7Ding H,Lim A,Rodrigues B,et al.The over constrained airport gate assignment problem[J].Computers and Operations Research,2004,32:1867-1868..
  • 8Gu Y,Chung C.Genetic algorithm approach to aircraft gate reassignment problem[J].ASCE Journal of Transportation Engineering,1999,125:384-389..
  • 9Bard J,Yu G,Argüello M.Optimizing aircraft routings in response to groundings and delays[J].HE Transactions,2001,33:931-947..
  • 10Hamzwawi S.Management and planning of airport gate capacity: a microcomputerbased gate assignment simulation model[J].Transportation Planning and Technology,1986,11:189-202..

共引文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部