摘要
随着充电桩的大量接入及充电的无序性,其对台区重载增加带来一定影响。开发基于充电桩数据的重载台区分析应用,首先筛选出该地区重载台区和重载时段用户,然后分析重载是否和充电桩相关,通过短信下发至台区经理现场处理,降低充电桩用电功率;此外通过V2G改造等方式,对适合的台区进行改造,降低建设成本;并根据充电桩发展趋势对台区增容做出超前规划;最后以某台区实际案例,验证本文方法的有效性。
With the large number of charging piles and the disorder of charging,it has a certain impact on the increase of heavy load in the platform area.The heavy-duty station area analysis application based on charging pile data was developed.Firstly,users in the heavy-duty station area and the heavy-duty period in the area were screened out,and then whether the heavy load was related to the charging pile was analyzed and sent to the station manager through SMS for on-site processing to reduce the power consumption of the charging pile.In addition,through V2G transformation and other ways,the suitable platform area is transformed to reduce the construction cost;According to the development trend of charging pile,the capacity of the platform area is planned in advance.Finally,the validity of the proposed method is verified by an actual case of a station area.
作者
樊国旗
陈伟杰
方冰燕
刘凤超
李建名
FAN Guoqi;CHEN Weijie;FANG Bingyan;LIU Fengchao;LI Jianming
出处
《青海电力》
2024年第2期44-47,64,共5页
Qinghai Electric Power
关键词
充电桩
重载台区
增容
charging pile
heavy load platform area
capacity increase