摘要
由于ASME-PTC4.4规程并没有明确描述余热锅炉效率的试验程序,导致在相关联合循环机组性能试验工程中找不到具体的条款及法规作为支撑。现从余热锅炉效率性能试验为切入点,以孟加拉希拉甘杰2号机225 MW联合循环发电机组性能试验参数为基础,以ASME-PTC4.4(2008)规程为参考,论述余热锅炉效率的试验程序。
Since the ASME-PTC4.4 code does not explicitly describe the test procedure for the efficiency of heat recovery steam generator(HRSG),specific provisions and regulations cannot be found as support in the performance test project of related combined cycle units.Takes the efficiency performance test of HRSG as the entry point and takes the performance test parameters of the 225MW combined cycle generator unit of Shiraganj Unit No.2 in Bangladesh as the basis according to ASME PTC4.4(2008)code as reference,the test procedure of HRSG efficiency is discussed.
作者
王志刚
周润梅
王鑫霞
WANG Zhi-gang;ZHOU Run-mei;WANG Xin-xia(China National Energy Engineering&Construction Co.,Ltd.;The Fourth Hospital of Harbin Medical University;Qingdao Hisense Hitachi Air-conditioning Marketing Co.,Ltd.)
出处
《电站系统工程》
2024年第3期41-42,共2页
Power System Engineering
关键词
余热锅炉效率
平衡空气量
排烟温度
汽水系统
efficiency of HRSG
excess air
temperature of flue gas
steam&water system