摘要
为减少传统爆破工艺施工煤仓带来的安全风险,降低作业人员的劳动强度,提出使用防爆液压挖掘机对国家能源集团宁夏煤业有限责任公司枣泉煤矿(以下简称枣泉煤矿)+1 085 m煤仓进行施工,现场应用后,提前30 d完成设计工程量,提高了施工质量。
In order to reduce the safety risks brought by traditional blasting techniques to the construction of coal bunkers and decrease the labor intensity of operators,it was proposed to use explosion-proof hydraulic excavators to construct the+1,085m coal bunker at Zaoquan Coal Mine of CHN Energy Ningxia Coal Industry Co.,Ltd.After on-site application,the designed quantities were completed 30 days in advance,and the construction quality was improved.
作者
任帅
REN Shuai(Fully-mechanized mining Service Branch of CHN Energy Ningxia Coal Industry Co.,Ltd.,Lingwu,Ningxia 750415)
出处
《能源科技》
2023年第6期38-40,共3页
Energy Science and Technology
关键词
煤仓
施工工艺
防爆液压挖机
Coal Bunker
Construction Technology
Explosion-proof Hydraulic Excavator