南方湿热多雨区某隧道施工组织设计

Construction Organization Design of a Tunnel in Muggy and Rainy Areas in Southern China
在线阅读 下载PDF
导出
摘要 为使隧道工程方案和施工计划经济、合理,使用新奥法进行施工组织设计,在工程施工中要充分利用和发挥围岩的自承能力,首先要对隧道岩体进行围岩分级,可使用围岩分级(BQ值)法、围岩分级(Q值)法、围岩分级(RMR值)法。文章主要分析了这三种方法相应的计算方法,得出相应的结论,旨在解决围岩分级繁杂、不统一的问题,为施工开挖提供有效理论依据。 In order to make the tunnel engineering scheme and construction plan economical and reasonable,the New Austrian Tunneling Method is used for construction organization design.In the engineering construction,the self-bearing capacity of surrounding rock should be fully utilized and brought into play.First of all,the surrounding rock mass of the tunnel should be classified.The surrounding rock classification(BQ value)method,surrounding rock classification(Q value)method,and surrounding rock classification(RMR value)method can be used.The corresponding calculation methods of these three methods are mainly analyzed to draw corresponding conclusions.The purpose is to solve the problem of complicated and inconsistent classification of surrounding rock,and to provide effective theory basis for construction excavation.
作者 王冰洋 颜浩 WANG Bingyang;YAN Hao(Shandong Luqiao Group Co.,Ltd.,Jinan 250000,Shandong,China)
出处 《工程技术研究》 2023年第11期189-191,共3页 Engineering and Technological Research
关键词 隧道施工组织 新奥法 围岩等级 开挖工法 tunnel construction organization New Austrian Tunneling Method surrounding rock grade excavation method
  • 相关文献

参考文献4

二级参考文献85

共引文献185

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部