摘要 由于矿岩破碎,采区通风天井掘砌施工安全性较差,反掘扩孔和反掘扩刷过程中均存在塌方等安全风险。以某铁矿复杂破碎采场为背景0,进行通风天井预注浆加固基岩深孔爆破成井技术研究与实践。采用“正掘导孔+反掘扩孔+反掘扩刷”技术进行采区通风天井施工,针对塌方段提出2种施工方案:钢圈加固和壁后浇筑充填支护工艺、钢筒预埋注浆管浇筑充填和注浆加固联合支护工艺,虽能达到预期处理效果,但施工工期长;在此基础上,提出破碎采场通风天井下行注浆加固基岩及大直径深孔凿岩分段爆破成井施工工艺,可有效避免井筒塌方风险,工期缩短50%。可为破碎采场盲竖井掘砌施工提供一条新思路。 Due to the broken ore and rock,the safety of excavation and masonry construction of the ventilation raise in the mining area is poor,and there are safety risks such as landslides during the process of reverse excavation and reaming and reverse excavation and brushing. Based on the background of a complex crushing stope in an iron mine,the study and practice of deep hole blasting technology of ventilation patio pre-grouting to reinforce bedrock are carried out. Adopt the technology of "forward driving pilot hole + reverse driving and expanding hole + reverse driving and expanding brush" to construct the ventilation patio in the mining area. Two construction schemes are proposed for the collapse section,named steel ring reinforcement and back-casting filling support technology,and combined support technology of steel tube embedded grouting pipe pouring and filling and grouting reinforcement. Although the proposed two processes can achieve the expected treatment effect,the construction period is long. On this basis,the construction technology of down grouting to strengthen the bedrock in the ventilation raise of the broken stope and the staged blasting of the large-diameter deep hole rock drilling is proposed. It can effectively avoid the risk of wellbore collapse and reduce the construction period by 50%,besides that,it can also provide a new idea for the construction of blind shaft excavation and masonry in broken stope.
作者 路燕泽 甘德清 杨志强 王立杰 王社光 尹爱民 LU Yanze;GAN Deqing;YANG Zhiqiang;WANG Lijie;WANG Sheguang;YIN Aimin(School of Mining Engineering,North China University of Science and Technology,Tangshan 063210,China;Hebei Mining Development and Safety Engineering Laboratory,Tangshan 063210,China;Shahe Zhongguan Iron Mine Co.,Ltd.,Hebei Iron and Steel Group,Xingtai 054100,China)
出处 《金属矿山》 CAS 北大核心 2022年第12期30-35,共6页 Metal Mine
基金 河北省重大科技成果转化专项(编号:19073818Z)。
关键词 破碎采场 通风天井 注浆加固 深孔爆破成井 broken stope ventilation wellbore grouting reinforcement wellbore construction by deep hole blasting
  • 相关文献

参考文献12

二级参考文献73

共引文献267

同被引文献28

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部