期刊文献+

A novel coordinated control for NZEB clusters to minimize their connected grid overvoltage risks

原文传递
导出
摘要 The increasing applications of net-zero energy buildings (NZEBs) will lead to more frequent and larger energy interactions with the connected power grid, thereby being able to result in severe grid overvoltage risks. Control optimization has been proven effective to reduce such risks. Existing controls have oversimplified the overvoltage quantification by simply using the aggregated power exchanges to represent the connected grid overvoltages. Ignoring the complex voltage influences among the grid nodes, such oversimplification can easily result in low-accuracy impact evaluations of the NZEB-grid energy interactions, thereby causing non-optimal/unsatisfying overvoltage mitigations. Therefore, this study proposes a novel coordinated control method in which a power-distribution-network model has been adopted for more accurate overvoltage quantification. Meanwhile, the battery operations of individual NZEBs are iteratively coordinated using a sequential optimization approach for achieving the global optimum with substantially reduced computation complexity. For verifications, the proposed coordinated control has been systematically compared with an uncoordinated control and a conventional coordinated control in grid overvoltage minimization. The study results show that the overvoltage improvements can reach 23.5% and 12.3% compared with the uncoordinated control and the conventional coordinated control, respectively. The reasons behind the improvements have also been analyzed in detail. The proposed coordinated control can be used in practice to improve NZEB-clusters’ grid friendliness.
出处 《Building Simulation》 SCIE EI CSCD 2022年第10期1831-1848,共18页 建筑模拟(英文)
  • 相关文献

参考文献3

二级参考文献4

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部