优化水轮发电机组开停机操作流程增加发电量的措施 被引量:1

Measures for Optimizing Operation Process of Turbine Generator Unit Start-up and Stop to Increase Power Generation
在线阅读 下载PDF
导出
摘要 以大化电厂为例,详细分析机组开停机流程及各节点的耗时,通过优化开停机操作流程,缩短机组并网、解列时间,从而达到降低机组空载水耗增加发电量的目的,为大化电厂实现“无人值班、少人值守”运行模式提供可靠的技术支持。 Taking Dahua Power Plant as an example,the start-up and shutdown process of units and the timeconsuming of each node are analyzed in detail in this paper.By optimizing the process of start-up and shutdown,the time of grid connection and disengagement can be shortened.It achieves the purpose of reducing the no-load water consumption of units and increasing power generation,and provides reliable technical support for Dahua Power Plant to realize the operation mode of"unattended and few on duty".
作者 金海霞 JIN Hai-xia(Guangxi Guiguan Electric Power Co.,Ltd.,Dahua Hydropower Plant,Dahua 530800,China)
出处 《云南水力发电》 2022年第11期234-237,共4页 Yunnan Water Power
关键词 水轮发电机组 操作流程 开停机时间 耗水率 发电量 turbine generator unit operating flow start-up and stop time water consumption rate power generation
  • 相关文献

参考文献4

二级参考文献20

共引文献18

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部