摘要
结合柬埔寨金边港LM17集装箱码头二期扩建项目工程实例,对自行改造打桩船的沉桩桩锤选择进行了分析,阐述了在沉桩过程中出现的桩位偏差现象并提出了有效可行的解决措施,为后续在该地区开展此类施工提供参考。
Combined with the second phase expansion project of LM17 container terminal in Phnom Penh Port,Cambodia, the selection of pile sinking hammers for self-transforming floating pile driver is analyzed, and the phenomenon of pile position deviation in the process of pile sinking is expounded, and the effective and feasible solutions are put forward. It can provide reference for such construction in the region.
作者
杨林
田磊
YANG Lin;TIAN Lei(Shanghai Construction Group Co.,Ltd.Overseas Business Department,Shanghai 200032,China)
出处
《建筑施工》
2022年第10期2282-2285,共4页
Building Construction
关键词
打桩船
钢管桩
桩锤选择
桩位偏差
floating pile driver
steel pipe pile
pile hammer selection
pile position deviation