地质雷达在公路隧道交工检测中的应用 被引量:3

Application of Ground Penetrating Radar in Highway Tunnel Handover Detection
在线阅读 下载PDF
导出
摘要 根据《公路工程竣(交)工验收办法实施细则》对隧道的要求,介绍了地质雷达用于公路隧道交工验收的检测方法,包括仪器设备选择、检测测线布置、混凝土相对介电常数标定等内容,分析了二次衬砌厚度不足、二次衬砌后空洞、二次衬砌不密实、防水板卷入二次衬砌等常见病害缺陷,指出了实施细则与检测方法的不足并提出相应的改进措施。 According to the Detailed Rules for Implementation of Acceptance Measures for Completion(Delivery) of Highway Projects, this article introduces the detection method of ground penetrating radar for the handover and acceptance of highway tunnel, including the selection of instruments and equipment, the layout of detection lines, the calibration of the relative dielectric constant of concrete, etc., and analyzes the insufficient thickness of the secondary lining, the cavity after the secondary lining, the non compactness of the secondary lining,the waterproof board involved in the secondary lining and other common diseases and defects, points out the shortcomings of the implementation rules and detection methods, and puts forward the corresponding improvement measures, so as to provide reference for similar work.
作者 汪洋 WANG Yang(China Merchants Chongqing Highway Engineering Testing Center Co.Ltd.,Chongqing 400067,China)
出处 《工程建设与设计》 2022年第14期122-124,共3页 Construction & Design for Engineering
关键词 公路隧道 交工 地质雷达 检测 highway tunnel handover ground penetrating radar detect
  • 相关文献

参考文献3

二级参考文献21

共引文献9

同被引文献17

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部