长江崩岸应急治理方案研究及应用 被引量:1

Study and Application of Emergency Management Scheme for Bank Collapse of Yangtze River
在线阅读 下载PDF
导出
摘要 为了确保内河向长江泄洪通道的顺畅,入江口附近江堤崩岸治理是十分必要的。提出抛石与主动钩连体抛护江堤方案,总结了江滩抛投工程特有的安全隐患注意事项。并结合抛投区域的复杂地理条件,重点分析抛投技术流程应用于长江(江苏段)崩岸治理工程中。根据现场抛投试验数据,提出块石与钩连体的水平漂距计算公式,得到工程段抛投体漂距为5.2~7.5 m,进而可选用12 m吊臂的起重机在5 m宽、10 m长的单元内进行抛投,经水下地形测试抛投效果良好,为类似工程提供参考。 In order to ensure the smooth discharge channel of the inland river to the Yangtze River,it is necessary to treat the embankment collapse near the mouth of the river.A scheme of protecting the river dike by riprap and active hook is put forward.The special cautions for the safety hidden danger of the river beach jettisonin project are summarized.Combined with the complex geographical conditions of the jettisonin area,the application of the jettisonin technology process in the Yangtze River(Jiangsu section)Bank Collapse Management Project is specially analyzed.According to the on-site jettisonin test data,the calculation formula of horizontal drift distance between the block rock and hook is put forward,and the drift distance of the jettisonin in the project section is 5.2~7.5 m.Furthermore,a crane with 12 m boom can be used for the jettisonin in the unit of 5 m wide and 10 m long.The jettisonin effect is good after the underwater terrain test,which provides reference for similar projects.
作者 郭晓玲 姚玉扣 GUO Xiaoling;YAO Yukou
出处 《城市道桥与防洪》 2022年第2期137-140,M0013,M0014,共6页 Urban Roads Bridges & Flood Control
关键词 江堤 崩岸整治 主动式钩连体 抛投试验 质量控制 embankment bank collapse management active hook coupling jettisonin test quality control
  • 相关文献

参考文献9

二级参考文献100

共引文献38

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部