矩形盾构顶管下穿市政设施施工技术 被引量:6

On construction technology of rectangular shield pipe jacking and underpassing municipal facilities
在线阅读 下载PDF
导出
摘要 深圳地铁10号线某车站道路下方分布有天然气、通讯、交通等重要市政管线,横跨出入口通道上方的电力管廊埋深约0.91 m~2.63 m,因开挖难度大,影响路面交通,且交通不能中断,因此需顶管法进行非开挖式施工。为研究矩形断面顶管施工在深圳主干道下穿过程中受力变化特征,采用现场数据监测、理论计算分析等手段对顶进施工中施工重难点进行了技术总结。结果表明:矩形顶管施工避免了明挖施工造成的交通中断、管线迁改等,施工过程安全有效,节约了人力及相关资源成本。 Important municipal pipelines such as natural gas,communication and transportation are distributed under the road of a station of Shenzhen Metro Line 10.The buried depth of power pipe gallery above the entrance and exit passageway is about 0.91~2.63 meters.Due to the difficulty of excavation,the road traffic will be affected and the traffic can not be interrupted,so the trenchless construction should be carried out by pipe jucking method.In order to study the force variation characteristics of rectangular section pipe jacking construction in the process of underpassing the main road in Shenzhen,the key points and difficulties in the jacking construction were summarized by means of field data monitoring and theoretical calculation and analysis.The results show that the rectangular pipe jacking construction avoids the traffic interruption and pipeline relocation caused by open cut construction,the construction process is safe and effective,and the cost of manpower and related resources is saved.
作者 李尚辉 Li Shanghui(Shenzhen Metro Group Co.,Ltd.,Shenzhen 518000,China)
出处 《山西建筑》 2021年第23期130-131,174,共3页 Shanxi Architecture
关键词 顶管施工 参数计算 受力分析 沉降控制 pipe-jacking construction parameter calculation force analysis settlement control
  • 相关文献

参考文献1

二级参考文献7

共引文献12

同被引文献56

引证文献6

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部