摘要
老挝Sepon解吸电解项目建设基于黄金的扩产与降本增效的初衷,其中涉及工艺设备、建设安装及运营监测等环节涉及诸多技术的把控问题。在疫情影响下的海外金矿建设面临诸多挑战,对各环节技术的严格把控对项目的顺利竣工投产至关重要。
The original intention of the construction of Sepon desorption electrolysis project in Laos is based on the expansion of production,cost reduction and efficiency increase of gold,which involves process equipment,construction and installation,operation monitoring and many technical control problems.Under the influence of the epidemic,the construction of overseas gold mines is facing many challenges.Strict control of all links of technology is very important for the smooth completion and operation of the project.
作者
马涛
盛勉桥
MA Tao;SHENG Mianqiao(BGRIMM Technology Group,Beijing 100160,China)
出处
《中国矿业》
2021年第S02期323-325,共3页
China Mining Magazine
关键词
解吸电解
建设过程
技术把控
desorption electrolysis
construction process
technical control