摘要
城市森林步道的施工在我国目前尚处于起步阶段,尤其对复杂山地森林条件下便道施工的路线选择及施工工艺研究少之又少。通过结合无人机航拍数字表面建模技术、等高线地形平面图分析、实地勘察以及BIM技术对云道项目的施工便道进行路线设计,并介绍了施工便道的结构形式和施工,解决了在复杂山地森林条件下施工材料构件和大型机械设备的进出场问题,在1个月内完成云道项目施工便道的铺设,并实现了高效、少开挖、少破坏原森林植被的目的。
At present,the construction of urban forest trails is still in its infancy in China,especially in the complex mountain forest conditions,there are few researches on route selection and construction technology of auxiliary construction access roads.The route design of the construction access road of the cloud road project is carried out by combining the UAV aerial photography digital surface modeling technology,contour terrain plan analysis,field investigation and BIM technology,and the structural form and construction of the construction access road are introduced,which solves the entry and exit problems of construction materials and large-scale machinery and equipment under complex mountain forest conditions,and the laying of the construction access road of the cloud road project is completed within one month.And the goal of high efficiency,less excavation and less damage to the original forest vegetation has been achieved.
出处
《建筑技术开发》
2021年第14期64-66,共3页
Building Technology Development
关键词
复杂山地
施工便道
路线设计
不破坏森林植被
complex mountainous area
construction access road
route design
no destruction of forest vegetation