时空条件限制下的“丝路”营造——杭州市余杭区亚运场馆改扩建工程EPC项目侧记 被引量:4

The Construction of "Silk Road" Under the Space-Time Limitations:Sidelights of Yuhang Sports Center Renovation Project for 2022 Asian Games
在线阅读 下载PDF
导出
摘要 随着2022年杭州亚运会的临近,余杭区亚运场馆改扩建工程也已竣工。回顾项目过程,从新旧建筑关系的融合、复杂功能流线的组织,以及限额设计、BIM协同、工期组织等EPC实践方法的角度,对时空条件限制下设计引领的EPC工程做一小结。 As 2022 Asian Games approaches, the reconstruction of Yuhang Sports Center has now been completed. Recalling the process from plan to completion, this text summarizes the guidance of design in the practice of Engineering Procurement Construction(EPC) mode under the constrained conditions by space and time, including the design strategies such as the integration of new and old buildings, the organization of complex functions and streamlines, as well as the EPC practice methods like quota design, BIM synergy and schedule control.
作者 许世文 裘云丹 李迅 吴云海 尹明明 XU Shiwen;QIU Yundan;LI Xun;WU Yunhai;YIN Mingming
出处 《建筑技艺》 2021年第5期56-61,共6页 Architecture Technique
关键词 亚运场馆 改扩建 BIM EPC Asian Games stadium reconstruction and expansion Building Information Modeling(BIM) Engineering Procurement Construction(EPC)
  • 相关文献

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部