摘要
以井下首采作业面冲击地压防治为对象开展探究,结合具体工程实际,从冲击地压监测预警和冲击地压防治措施两方面入手对如何实现冲击地压问题的有效防治进行了探究,希望能够为其他矿井相似工程的开展提供借鉴和参考。
The discussion was carried out on the prevention and control of rock burst at the first mining working face of the underground mine.Combined with the actual project,this paper discussed how to realize the effective prevention and control of rock burst from two aspects of rock burst monitoring and early warning and prevention and control measures for rock burst,hoping to provide reference for the development of similar projects in other mines.
作者
郭哲
GUO Zhe(No.1 Team of Fully Mechanized Mining,Meiyukou Coal Mine,Jinneng Holding Coal Industry Group,Datong 037001,Shanxi,China)
出处
《能源与节能》
2021年第5期20-21,共2页
Energy and Energy Conservation
关键词
矿井
冲击地压
预警监测
mine
rock burst
early warning and monitoring