期刊文献+

梯级枢纽调控下西江干线末端航道设计水位推算 被引量:1

Design water level of the end of Xijiang Channel considering the cascade reservoir scheduling
在线阅读 下载PDF
导出
摘要 长洲枢纽坝下—界首河段位于西江航运干线广西境内末端,其上游已建或规划建设多座梯级枢纽,该河段河床受到清水冲刷,加之人为无序采砂,河床下切明显。配合贵港至梧州3000 t级航道工程建设,现状条件下航道设计水位已较前期工可阶段有明显下降。为了保证贵梧3000 t级航道工程的建设,文章采用长洲枢纽运行后实测地形、水文实测资料,对长洲枢纽坝下—界首河段设计水位进行重新推求,并根据推求结果提出贵梧3000 t级(长洲坝下—界首)河段航道设计水位应充分考虑长洲水利枢纽运行导致的河床下切以及航道整治开挖为3000 t级航道共同影响引起的枯水期水位备降值。 The incoming water and sediment of river channels below the dam can be changed influenced by the cascade reservoir scheduling.The riverbed is scoured,just like the riverbed of the end of Xijiang Channel(river reach below the Changzhou Reservoir to Jieshou),which influences the design water level.In order to determine the water level of the Guigang-Wuzhou 3000 DWT channel project,the topography and hydrological data after the Changzhou reservoir schedule were used to re-calculate the design water level.The design water level of the end of Xijiang Channel should consider the enough devaluation caused by the riverbed scour and 3000 DWT channel regulation project simultaneously.
作者 覃昌佩 王鑫 冯小香 QIN Chang-pei;WANG Xin;FENG Xiao-xiang(Guangxi Communications Design Group CO. LTD., Nanning 530011, China;Tianjin Research Institute for Water Transport Engineering, Key Laboratory of Engineering Sediment, Ministry of Transport, Tianjin 300456, China)
出处 《水道港口》 2021年第1期74-77,113,共5页 Journal of Waterway and Harbor
基金 国家自然科学基金(51809130) 中央级公益性科研院所基本科研业务费专项资金资助项目(TKS190104)。
关键词 设计水位 梯级枢纽 河床下切 design water level cascade reservoir riverbed scour
  • 相关文献

参考文献7

二级参考文献66

共引文献39

同被引文献12

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部