抽水蓄能电站地下洞室人员定位装置研究

Research on Personnel Positioning Device for Underground Cavern of Pumped Storage Power Station
在线阅读 下载PDF
导出
摘要 根据地下洞室施工特性及地质条件,本研究对地下洞室人员定位装置进行重新设计。其间详细介绍了洞口检卡系统的安装、调试注意事项,指出了洞室内分站、读卡器的安装位置要求,确保系统可靠运行和监测人员位置信息准确;结合人员定位同步显示系统,将地下洞室内部情况和进出洞室通过显示屏方式反映出来;对定位管理系统进行系统的模块化规划,避免人员操作不当而导致信息不能及时传送,保证人员定位系统运行安全,有效提高工作效率。 According to the construction characteristics and geological conditions of underground caverns,this study redesigned the personnel positioning device of underground caverns.In the meantime,the installation and debugging precautions of the hole inspection card system were introduced in detail,and the requirements for the installation location of the substation and the card reader in the cave were pointed out to ensure the reliable operation of the system and the accurate location information of the monitoring personnel;combined with the personnel positioning synchronization display system,the underground cave room and the entrance and exit of the cave room were reflected through the display screen;the positioning management system was systematically modularized to avoid improper operation of personnel and the information cannot be transmitted in time,so as to ensure the safe operation of the personnel positioning system,and effectively improve work efficiency.
作者 史文龙 颜志恒 李军 王波 陆长亮 SHI Wenlong;YAN Zhiheng;LI Jun;WANG Bo;LU Changliang(Sinohydro Bureau Co.,Ltd.,Chengdu Sichuan 610213;North China Institute of Science&Technology,Langfang Hebei 065201)
出处 《河南科技》 2021年第3期63-65,共3页 Henan Science and Technology
基金 河北省自然科学基金(E2019508088) 中央高校基本科研业务费(3142018034)。
关键词 地下洞室 人员定位 同步显示 安全施工 underground cavern personnel positioning synchronous display safe construction