克孜河渡槽充水试验与承载力安全评价 被引量:5

Water Filling Test and Bearing Capacity Safety Evaluation of Kizihe River Aqueduct
原文传递
导出
摘要 为检验克孜河渡槽承载能力储备情况,通过现场充水试验模拟渡槽在实际运行阶段的工作状态,揭示在各级水荷载作用下渡槽的挠度和应变变化规律,完善渡槽承载能力的评价指标,按照预期的方案对渡槽试验段展开充水试验,根据监测结果对结构进行安全评价。结果表明,第7跨跨中各梁实测总挠度均小于规范要求;第7、8两跨跨中各梁实测应变随荷载的增大而增大,实测残余应变归零情况正常,应变规律符合理论预期且相对残余应变均小于20%,满足规程要求;根据克孜河渡槽有限元计算结果,参考第8跨跨中中梁理论最大应力增量为1.37MPa,现场实测最大应力增量为1.22MPa,实测最大应力增量仍未超过理论最大应力增量,且应变计算结果与实测应变结果相一致,说明槽身结构在各工况下无较大的不可恢复变形且处于弹性工作阶段;试验段中梁、边梁跨中位置结构校验系数分别为0.89、0.79,满足规程要求,试验结果合理有效。 In order to test the bearing capacity reserve of the aqueduct on Kizihe River,the working state of the aqueduct in the actual operation stage is simulated through the field water filling test,and the deflection and strain change law of the aqueduct under the action of water load at all levels are revealed.And the evaluation index of the bearing capacity of the aqueduct is improved.Then the water filling test is carried out for the aqueduct test section according to the expected scheme,and the safety evaluation of the structure is carried out according to the monitoring results.The results show that the measured total deflection of each beam in the seventh span is less than the specification requirements;The measured strain of each beam in the seventh and eighth spans increases with the increase of load,and the measured residual strain returns to zero normally,the strain law meets the theoretical expectation and the relative residual strain is less than 20%,which meets the specification requirements;According to the finite element calculation results of Kizihe river aqueduct,referring to the eighth span,the theoretical maximum stress increment of the middle beam is 1.37 MPa,and the field measured maximum stress increment is 1.22 MPa.The measured maximum stress increment still does not exceed the theoretical maximum stress increment,and the strain calculation results are consistent with the measured results,which indicates that the groove body structure has no large irrecoverable deformation under various working conditions and is in the elastic working stage.In the test section,the structural check coefficients of middle beam and side beam at midspan are 0.89 and 0.79,which meet the specification requirements,and the test results are reasonable and effective.
作者 刘涛 何建新 刘亮 杨志豪 LIU Tao;HE Jian-xin;LIU Liang;YANG Zhi-hao(College of Hydraulic and Civil Engineering,Xinjiang Agricultural University,Urumqi 830052,China;Xinjiang Key Laboratory of Hydraulic Engineering Security and Water Disasters Prevention,Urumqi 830052,China)
出处 《水电能源科学》 北大核心 2021年第4期100-104,共5页 Water Resources and Power
基金 国家自然科学基金项目(51869031)。
关键词 渡槽 充水试验 承载力 挠度 相对残余应变 结构校验系数 aqueduct water filling test bearing capacity deflection relative residual strain structural calibration coefficient
  • 相关文献

参考文献7

二级参考文献27

  • 1吴建军,陈和,张启伟,袁万城.现场桥梁静载试验评定与分析[J].公路,2004,49(12):62-65. 被引量:15
  • 2陈孝珍,朱宏平,陈传尧.基于静载试验的桥梁安全性评价[J].华中科技大学学报(城市科学版),2005,22(3):37-39. 被引量:13
  • 3国家电力公司大坝安全监察中心.混凝土坝安全监测技术规范(DL/T5178-2003)[S].北京:中国电力出版社,2003.
  • 4冯光伟,王彩玲,张玉明,等.沙河南—黄河南沙河渡槽段工程招标设计报告[R].郑州:河南省水利勘测设计研究有限公司,2009.
  • 5陈晓光,买巨马啸中原,等.南水北调沙河渡槽第一次充水试验成果及工程质量和结构安全分析报告[R].郑州:河南省水利勘测设计研究有限公司,2013.
  • 6冯光伟,陈晓光,买巨等.南水北调中线一期工程沙河渡槽段充水试验工作大纲[R].郑州:河南省水利勘测设计研究有限公司,2013.
  • 7中国水电顾问集团华东勘测设计研究院,国家电力监管委员会大坝安全监察中心,中国水电顾问集团昆明勘测设计研究院,等.土石坝安全监测技术规范(DL/T5259-2010)[s].北京:中国电力出版社,2011.
  • 8国家测绘局测绘标准化研究所,国家测绘局第一大地测量队,国家测绘局大地测量数据处理中心,等.国家一二等水准测量规范(GB/T12897-2006)[s].北京:中国标准出版社,2006.
  • 9王慧.花园渡槽充水试验及分析[J].安徽水利科技,1998(2):45-47. 被引量:1
  • 10王春平.某钢桁架桥静载试验研究[J].土木工程与管理学报,2011,28(1):76-79. 被引量:3

共引文献26

同被引文献39

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部