期刊文献+

煤巷掘进过地质构造的技术探索与实践 被引量:3

Technical Exploration and Practice of Coal Roadway Driving through Geological Structure
原文传递
导出
摘要 主要针对金川煤矿矿井东翼E8202工作面标高900~1 350 m的向斜地质构造情况,结合矿井实际生产状况,修订掘进方案,降低巷道坡底,并使用辅助液压系统增加综掘机爬坡能力,边掘边探边分析,充分利用地质钻孔、深孔超前钻探、三维地震成果,分析煤层产状、煤厚变化情况,最终顺利通过此段向斜地质构造,解放了东翼采区约270万t的储量,此工程从地质分析和掘进工艺方面提出了解决此类地质问题的对策。 Mainly aimed at the Jinchuan coal mine east wing E8202 face elevation 900 to 1 350 m synclinal geological tectonic situation, in combination with the practical production situation of the mine,changes to the excavation scheme, reduce roadway bottom, and the use of auxiliary hydraulic system increased gradeability comprehensive tunneling machine, dug while delineation analysis, make full use of geological drilling, deep hole drilling in advance, 3 D seismic results, analysis of coal seam occurrence,coal thickness variation, eventually passed the period of synclinal geological structure, the liberation of the east wing mining area of about 2.7 million tons of reserves, the project from the aspects of geological analysis and excavation process puts forward some countermeasures to solve this kind of geological problems.
作者 朱徽 ZHU Hui(Xinjiang Jinchuan Group Co.,Ltd.,Tiemenguan 841011,China)
出处 《煤炭技术》 CAS 北大核心 2021年第2期48-50,共3页 Coal Technology
关键词 煤矿 综掘工作面 向斜 顺槽掘进 掘进工艺 coal mine comprehensive excavation face syncline heading down the channel tunneling process
  • 相关文献

参考文献3

二级参考文献6

共引文献17

同被引文献27

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部