期刊文献+

基于Petri网的产品研发设计工作流的柔性建模方法 被引量:4

A flexible modeling method for product development design workflow based on Petri net
在线阅读 下载PDF
导出
摘要 为了解决复杂产品研发设计工作流建模问题,提高产品研发设计工作流管理系统在运行中对动态变化的响应能力,提出了一种基于Petri网的柔性建模方法。该方法结合面向对象和分层的思想对Petri网进行扩展,利用优先级、变迁触发规则等属性规则描述了模型的柔性。该方法不仅可以降低产品研发设计工作流建模的复杂度,还可以支持产品研发设计工作流管理系统对资源调度、动态选择和异常响应的柔性控制。最后通过一个实例说明了该方法的可行性。 In order to solve the modeling of complex product development design workflow and improve the response ability of product development design workflow management system to dynamic changes in operation,a flexible modeling method based on Petri net was proposed.This method extended the Petri net with object orientation and hierarchical thinking,and described the flexibility of the model by using attribute and rules such as priority and transition trigger rules.This method can not only reduce the complexity of workflow modeling,but also support the flexible control of resource scheduling,dynamic selection and abnormal response of workflow management system.An example is given to illustrate the feasibility of this method.
作者 徐婷 乔立红 赵汉卿 XU Ting;QIAO Lihong;ZHAO Hanqing(School of Mechanical Engineering&Automation,Beihang University,Beijing 100191,China)
出处 《现代制造工程》 CSCD 北大核心 2021年第1期58-63,共6页 Modern Manufacturing Engineering
基金 国家重点研发计划资助项目(2018YFB1701800)。
关键词 研发设计 工作流 柔性建模 PETRI网 面向对象 product development design workflow flexible modeling Petri net object orientation
  • 相关文献

参考文献4

二级参考文献27

  • 1郭建飞,乔立红.产品开发过程的图示评审技术建模方法[J].计算机集成制造系统,2004,10(7):758-763. 被引量:14
  • 2徐志勇,张开富,李正兰,姜寿山.一种面向航空产品的分级网络计划方法[J].计算机集成制造系统,2006,12(5):727-730. 被引量:6
  • 3EVARISTO R,FENEMA P.A typology of project management:Emergence and evolution of new forms[J].International Journal of Project Management,1999,17:275-281.
  • 4BENEDETTI D,ARIELLE.GALILEO risk management process[C]//Proceedings of the AIAA Guidance,Navigation,and Control Conference and Exhibit.Montreal,Canada:American Institute of Aeronautics and Astronautics,2001:1-6.
  • 5HANS E,HERRORLEN W,LEUS R,et al.Ahierarchical approach to multi-project planning under uncertainty[J].The International Journal of Management Science,2007(35):563-577.
  • 6王众诧 张军.网络计划技术[M].沈阳:辽宁人民出版社,1984..
  • 7高俊涛,张莉.基于过程建模的项目进度计划方法[J].北京航空航天大学学报,2007,33(9):1099-1102. 被引量:7
  • 8HULSHOF P J H, KORTBEEK N, BOUCHERIE R J, et al. Taxo- nomic classification of planning decisions in health care: a review of the state of the art in OR/MS [J]. Health Systems, 2012, 1(2): 129 - 175.
  • 9VUYST S D, BRUNEEL H, FIEMS D. Computationally efficient e- valuation of appointment schedules in health care [ J]. European Journal of Operational Research. 2014, 237(3) : 1142 - 1154.
  • 10DENTON B T, ALAGOZ O, HOLDER A, et al. Medical decision making: open research challenges [ J]. IIE Transactions on Health- care Systems Engineering. 2011, 1(3) : 161 - 167.

共引文献21

同被引文献37

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部