期刊文献+

TSP及TEM结合法在隧道超前地质预报中的应用 被引量:3

The Application of the TSP-TEM Combined Method to the Advanced Geological Prediction During Tunnel Construction
在线阅读 下载PDF
导出
摘要 隧道超前地质预报的方法有多种,但每种方法都有一定的不足,单一的预报方法难以得到满意的结果。为提高预报精度,基于开挖面揭示围岩情况,在紫云隧道地质超前预报中采用TSP与瞬变电磁法相结合的方法准确预报了开挖面前方富水地质体的存在。工程实践表明,采用多种手段相互印证的方法,可以有效提高预报结果的准确性,从而指导隧道安全施工。 There are various methods to predict tunnel geology in advance,but each of the methods adopted has certain shortcomings.It is difficult to achieve satisfactory results by means of a single forecasting method.In order to improve the prediction accuracy,the TSP-TEM Combined Method is applied to accurately predict the existence of water-rich geological bodies in front of the excavation face of the Ziyun Tunnel upon the basis of the revelation of the surrounding rock conditions by the work face.Engineering practice shows that the method of mutual verification by multiple means can effectively improve the accuracy of the prediction results and guide the safe construction of tunnels.
作者 菅永明 JIAN Yongming(The Ziwang Expressway Construction Co. Ltd. of Guizhou Province of China,Anshun 560800,China)
出处 《国防交通工程与技术》 2021年第1期76-79,共4页 Traffic Engineering and Technology for National Defence
基金 贵州省交通科技项目(2018122032)。
关键词 岩溶隧道 超前地质预报 TSP法 瞬变电磁法(TEM) karst tunnel advanced geological prediction Tunnel Seismic Prediction(TSP)Method Transient Electromagnetic Method(TEM)
  • 相关文献

参考文献8

二级参考文献119

共引文献1171

同被引文献44

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部