高墩大跨度连续刚构桥的设计探讨 被引量:2

Discussion on Design of High-Pier Large-Span Continuous Rigid Frame Bridge
在线阅读 下载PDF
导出
摘要 针对高墩大跨度连续刚构桥箱梁开裂、跨中下挠、高墩刚度不足等问题,通过总结以往工程经验及教训,以南醒河特大桥为例,探讨高墩大跨度连续刚构桥的设计对策,主要结论如下:(1)确定合理的箱梁尺寸;(2)设置合理的腹板下弯束;(3)竖向预应力采用低回缩二次张拉锚固系统;(4)加强设计应力控制;(5)加强细节构造设计;(6)以风振舒适度控制高墩横向刚度。 Ai ming at the problems of box girder cracking,mid-span deflection,and insufficient high-pier stiffness of high-pier long-span continuous rigid frame bridges,by summarizing past engineering experience and lessons,taking Nanxinghe Extra Large Bridge as an example,discussion on the design countermeasures of high-pier long-span continuous rigid frame bridges,the main conclusions are as follows:(1)Deter mine reasonable box girder dimensions;(2)Set up reasonable web bending beams;(3)Use low-retraction secondary tension anchor system for vertical prestress;(4)Strengthen design stress control;(5)Strengthen the detailed structural design;(6)Control the lateral stiffness of high piers with wind vibration comfort.
作者 余科辉 YU Ke-hui(CCCC First Highway Consultants Co.,Ltd.,Xi’an,Shanxi 710065,China)
出处 《黑龙江交通科技》 2020年第12期70-72,共3页 Communications Science and Technology Heilongjiang
关键词 高墩大跨度连续刚构 箱梁开裂 跨中下挠 高墩刚度不足 设计对策 high-pier large-span continuous rigid frame bridge box girder cracking mid-span deflection insufficient high-pier stiffness design countermeasure
  • 相关文献

参考文献3

二级参考文献14

共引文献153

同被引文献7

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部