期刊文献+

煤矿生活污水厂扩容升级改造工程设计 被引量:2

Design of Expansion and Upgrading for a Coal Mine Sewage Plant
在线阅读 下载PDF
导出
摘要 结合大同某煤矿生活污水水量及水质特点,选用"A/O生物接触氧化+穿孔旋流絮凝+斜管沉淀+活性砂过滤"工艺对污水厂进行扩容升级改造。实践表明主要构筑物设计参数及工艺选择合理、科学,较好符合了工程实际。实际出水水质满足并优于设计要求的《城镇污水处理厂污染物排放标准》(GB18918-2002)一级A标准。 Based on the water quality and water quantity characteristics of a coal mine sewage in Datong,A combined treatment process including A/O biological contact oxidation,perforated vortex flocculation tank,inclined tube sedimentation,active sand filter was used for expansion and upgrading of sewage plant.The practice showed that the design parameters of the main structures and treatment process were reasonable and scientific,and conformed to reality.The actual effluent quality could meet or surpass class A standard of the Discharge Standard of Pollutants for Municipal Wastewater(GB18918-2002).
作者 郝瑞刚 李国东 Hao Ruigang;Li Guodong(Taiyuan Institute of Technology,Taiyuan 030008,China;Taiyuan Design Research Institute Group Co.,Ltd.,for Coal Industry,Taiyuan 030001,China)
出处 《山东化工》 CAS 2020年第22期142-144,共3页 Shandong Chemical Industry
关键词 A/O生物接触氧化 穿孔旋流絮凝池 斜管沉淀 活性砂滤池 A/O biological contact oxidation process perforated vortex flocculation tank inclined tube sedimentation active sand filter
  • 相关文献

参考文献4

二级参考文献18

共引文献28

同被引文献33

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部