“华龙一号”蒸汽发生器支承间隙计算研究 被引量:2

The Study on HPR 1000 Steam Generator Support Gap Calculation
在线阅读 下载PDF
导出
摘要 "华龙一号"机组ZH-65型蒸汽发生器下部水平支承为带间隙的支承结构,支承间隙对设备抗震性能有较大影响。本文对蒸汽发生器支承的间隙计算进行了研究,提出了热态调整间隙、冷态安装间隙、间隙验收值、最大间隙等四种间隙的计算方法,并基于上述四种间隙值,给出了蒸汽发生器支承间隙调整的合理步骤。通过工程实例计算,对各因素对总间隙的影响进行了进一步分析。 The lateral support for ZH-65 steam generator in HPR 1000 nuclear power plant is a structure with gap.The gap between the support and the steam generator has a great influence on the seismic performance of the equipment.This paper studies the support gap calculation,and gives the calculation method of four theoretical gaps.Based on the calculated value of the theoretical gaps,a reasonable step of the gap adjustment is given.The influence of various factors on the total clearance is further analyzed through the calculation of engineering example.
作者 汤臣杭 李磊 何戈宁 黄燕 许国文 TANG Chen-hang;LI Lei;HE Ge-ning;HUANG Yan;XU Guo-wen(Key Laboratory of Reactor System Design Technology,Nuclear Power Institute of China,Chengdu,Sichuan Prov.610213,China)
出处 《中国核电》 2020年第3期286-289,共4页 China Nuclear Power
关键词 蒸汽发生器 支承 间隙计算 间隙调整 steam generator support gap calculation gap adjustment
  • 相关文献

参考文献3

二级参考文献13

  • 1KENNEDY R P. Methodology for deriving seis- mic fragilities, TR-103959 [R]. California: Elec- tric Power Research Institute, 1994.
  • 2KASSAWARA R. Seismic fragilitiy application guide, 1003121 [R]. California: Electric Power Research Institute, 2002.
  • 3KASSAWARA R. Seismic fragilitiy application guide update, 1019200 [R]. California: Electric Power Research Institute, 2009.
  • 4WATANABE Y, MURAMATSU K; OIKAWA T. Seismic capacity evaluation of a group of ver- tical U-tube heat exchanger with support frames for seismic PSA[J]. Nuclear Engineering and Design, 2005, 235(2): 2 495-2 512.
  • 5NAKAMURA N, AKITA S, SUZUKI T, et al. Study of ultimate seismic response and fragility evaluation of nuclear power building using non- linear three-dimensional finite element model[J]. Nuclear Engineering and Design, 2010, 240(3): 166-180.
  • 6KIM J H, CHOI I K, PARK J H. Uncertainty analysis of system fragility for seismic safety evaluation of NPP[J]. Nuclear Engineering and Design, 2011, 241(1): 2 570-2 579.
  • 7HUANG Yinnan, WHITTAKER A S, LUCO N. A probabilistic seismic risk assessment proce- dure for nuclear power plants, ( I ) Methodolo- gy, ( II ) Application[J]. Nuclear Engineering and Design, 2011, 241(5): 3 985-4 003.
  • 8KENNEDY R P, RAVINDRA M K. Seismic fragilities for nuclear power plant risk studies [J]. Nuclear Engineering and Design, 1984, 79 (3) : 47-68.
  • 9KENNEDY R P, CORNELL C A, CAMPBELL R D. Probabilistic seismic safety study of an existing nuclear power plant[J]. Nuclear Engi- neering and Design, 1980, 59(4): 315-338.
  • 10PISHARADY A S, BASU P C. Methods to derive seismic fragility of NPP components: A summary[J]. Nuclear Engineering and Design, 2010, 240(6): 3 878-3 887.

共引文献7

同被引文献19

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部