期刊文献+

燃煤电厂发电机组集控管理和协调控制系统优化设计研究 被引量:8

Research on Optimal Design of Centralized Control Management and Coordinated Control System for Generating Units of Coal-fired Power Plants
在线阅读 下载PDF
导出
摘要 文章结合燃煤电厂机组管理问题,对发电机组集控管理和协调控制系统优化设计思路进行探讨,提出采用阶梯式系统框架结构实现一对多控制,确保机组能够实现电网负荷变化快速响应,从而满足负荷调节要求。 Based on the problems of unit management in coal-fired power plants,this paper discusses the optimal design ideas of the centralized control management and coordinated control system of generating sets,and puts forward the use of stepped system frame structure to realize one-to-many control,so as to ensure that the unit can achieve rapid response to changes in power grid load to meet the load regulation requirements.
作者 李骁 LI Xiao(Shanxi Zhangze Electric Power Changzhi Power Generation Co.,Ltd.,Changzhi 046000,China)
出处 《电工技术》 2020年第10期60-61,63,共3页 Electric Engineering
关键词 燃煤电厂 集控运行 机组协调控制 coal-fired power plant centralized control operation unit coordinated control
  • 相关文献

参考文献3

二级参考文献13

共引文献16

同被引文献27

引证文献8

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部