期刊文献+

余吾矿S5203回采工作面导水裂隙带发育高度探测 被引量:2

Detection of Development Height of Water Conducting Fracture Zone in S5203 Mining Face of Yuwu Mine
在线阅读 下载PDF
导出
摘要 采用分段注水法对余吾矿S5203工作面开采后顶板导水裂隙带发育高度进行探测,并详细阐述了分段注水探测原理、探测方案以及探测程序。并将探测结果与地面采用的高密度法探测结果进行比对。结果表明,采用分段注水法探测出的导水裂隙带高度具有较高的可信度,可以指导后续的顶板防治水、开采设计等工作。 The development height of roof water-conducting fracture zone after mining in S5203 working face of Yuwu Mine is detected by subsection water injection method,and the detection principle,detection scheme and detection procedure of subsection water injection are e-laborated in detail.The detection results are compared with those of the high density method used on the ground.The results show that the height of water-conducting fracture zone detected by subsection injection method has high reliability,which can guide the follow-up work of roof water control and mining design.
作者 李敏 LI Min(Shanxi Luan Group Yuwu Coal Industry Co.,Ltd.,Changzhi 046100,China)
出处 《煤矿现代化》 2020年第4期96-98,共3页 Coal Mine Modernization
关键词 回采工作面 导水裂隙带 发育高度 注水法 防治水 mining face water conduction fracture zone development height water injection method water control
  • 相关文献

参考文献6

二级参考文献36

共引文献55

同被引文献29

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部