摘要 为提高富水深厚砂层水泥土搅拌桩止水帷幕的止水效果,提出水泥土搅拌桩在施工中采用五轴水泥土搅拌桩代替双轴、三轴水泥土搅拌桩的方案。利用强制搅拌式五轴水泥土搅拌桩“两喷两搅”施工工艺,有效解决了水泥土搅拌桩在富水砂层中成桩质量差、止水帷幕效果不佳等问题,并通过在成桩后向桩内插入钢管,有效提高了止水帷幕的侧向抗压能力,使得止水桩可兼作挡土桩(墙)。在佛山维尚新零售综合体项目基坑支护工程中,应用水泥土搅拌桩新方案进行施工,取得了良好的支护效果,可为类似工程施工提供参考。 To improve the water-stopping effect of the waterproof curtain of cement soil mixing pile in the water-rich thick sandy stratum, the scheme of using five axis cement soil mixing pile in stead of two axis or three axis ceme nt soil mixing piles in the con structio n is put forward. By the con structio n tech no logy of "two sprays and two stirs" of the forced mixing five axis cement soil mixing pile, the problems such as the poor pile-forming quality of cement soil mixing pile in the water-rich thick sandy stratum and poor effect of the waterproof curtain are effectively solved. By inserting steel pipe into the pile after forming, the lateral compressive capacity of waterproof curtain is effectively improved, so that the water stopping pile can also be used as retaining pile (wall). In the foundation pit support project of Foshan Weishang new retail complex project, the new scheme is applied to the construction and good supporting effect is achieved, which can provide referenee for similar engineering construction.
作者 洪冬明 HONG Dongming(Guangdong Foundation Engineering Group Co.,Ltd.,Guangdong,Guangzhou 510620,China)
出处 《建筑施工》 2020年第5期694-697,共4页 Building Construction
关键词 富水深厚砂层 支护施工 五轴水泥土搅拌桩 成桩质量 water-rich thick sandy stratum support construction five axis cement soil mixing pile pile-formingquality
  • 相关文献

参考文献6

二级参考文献30

  • 1宁宝宽,陈四利,刘斌.水泥土搅拌桩的加固机理及其应用[J].西部探矿工程,2005,17(6):26-28. 被引量:6
  • 2何开胜.超深水泥土搅拌桩的原位水泥土强度特性[J].河海大学学报,1999,27:230-234.
  • 3JGJ 79-2002,建筑地基基础处理技术规范[S].
  • 4《型钢水泥土搅拌墙技术规程》(试行)(DGJ08-116-2005J10608-2005)(2005.上海).
  • 5岩土工程勘察规范(2009年版)GB50021-2001[S].2009(10).
  • 6福建东辰综合勘察院.永定县湖坑镇中心卫生院门诊综合大楼岩土工程勘察报告[R].2009.
  • 7福建融诚建设工程质量检测有限公司.永定县湖坑镇中心卫生院门诊综合大楼复合地基静载试验检测报告[R].2009.
  • 8JGJ79-91.建筑地基处理技术规范[S].[S].,..
  • 9Okumura T. Deep mixing method of Japan[A] Yonekura R, Terashi M, Shibazaki M. Grouting and Deep Mixing[C]. Rotterdam: A.A Balkema, 1996, 879-887.
  • 10Kamon M. Effect of grouting and DMM on big construction projects in Japan and the 1995 Hyogoken-Nambu Earthquake[A]. Yonekura R, Terashi M. and Shibazaki M, Grouting and Deep Mixing[C]. Rotterdam: A.A Balkema, 1996, 807-825.

共引文献104

同被引文献22

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部