期刊文献+

废弃煤矿积水对相邻煤矿的威胁分析

Threat Analysis of Abandoned Coal Mine Water to Adjacent Coal Mine
在线阅读 下载PDF
导出
摘要 定量分析废弃煤矿积水对防止废弃煤矿积水对相邻煤矿造成危害具有重要意义。本文以闭坑矿井和邻近矿井九里山矿为研究对象,利用回采空间法计算了闭坑矿井27采区的积水量,得到闭坑后采空区积水量为235572.555m^2,并利用数理统计方法对闭坑矿井的水位和水量变化进行分析,发现矿井水位回升速度与水量相关;并对邻近14142工作面的防隔水煤柱进行安全评价,结合两种计算方法对需留设的隔水煤柱宽度进行计算,判断出隔水目前煤柱可以抵挡住27采区的积水水压。 Quantitative analysis of the accumulated water in the abandoned coal mine is of great significance to prevent the harmfulness of the abandoned coal mine water to the adjacent coal mines.In this paper,the closed pit mine and the adjacent mine Jiulishan Mine are used as research objects.The water volume of the 27 closed pit mines is calculated by using the mining space method.Total water-filling volume in goaf after coal mine being closed is 235572.555m2.The mathematical level and statistical methods are used to analyze the water level and water volume change of the closed pit mine.The water level recovery speed is related to the amount of water;the safety evaluation of the water-proof coal pillars adjacent to the 14142 working face is performed,and it is judged that the current coal pillars can withstand the water pressure in the 27 mining area.
作者 吴玉川 李磊
出处 《科学技术创新》 2020年第18期154-156,共3页 Scientific and Technological Innovation
关键词 废弃矿井 积水量 水位回升 防隔水煤柱 积水水压 abandoned mines water accumulation water recovery waterproof coal pillar water pressure
  • 相关文献

参考文献7

二级参考文献46

  • 1张壮路.废弃煤矿采空区积水过程分析[J].西部探矿工程,2004,16(10):86-87. 被引量:10
  • 2熊崇山,王家臣.矿井采空区积水量的研究[J].矿业安全与环保,2005,32(2):10-11. 被引量:15
  • 3张运海,吴祥,李新华.顶板托板存在对采空区充水系数的影响[J].煤炭科学技术,2006,34(7):33-35. 被引量:5
  • 4赵苏启,武强,尹尚先.广东大兴煤矿特大突水事故机理分析[J].煤炭学报,2006,31(5):618-622. 被引量:37
  • 5吴持恭.水力学[M].北京:高等教育出版社,1987.
  • 6周建军 虎维岳 张壮路.废弃矿井地下水运动规律分析及水流数值模型的建立.煤炭学报,2006,31(1):70-73.
  • 7SHERWOOD J M, YOUNGER P L. Modeling grounderwater rebound after coalfield closure: an example from County Durham, United Kingdom[C]//Proceedings of the 5^th International Mine Water Congress, 1994(2): 769-777.
  • 8BRURKE S P, YOUNGER P L. Groundwater rebound in the South Yorkshire coalfield: a first approximation using the GRAM model[J]. Quarterly Journal of Engineering Geology and Hydro- geology, 2000, 33 : 149-160.
  • 9SHERWOOD J M. Modeling minewater flow and quality changes after coalfield closure[D]. Unpublished Ph.D. thesis, Department of Civil Engineering, University of Newcastle, 1997.
  • 10李玉柱,苑明顺.流体力学[M].北京:高等教育出版社,2000.

共引文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部